Relocate without risk. Produce more profitably.
Whether it's cost pressure, supplier insolvency, or quality issues: We take over your injection molds and series in a secure and structured manner. Through process optimization, automation, and the choice of the most economical site, we unlock potential savings.
Don't just relocate. Position yourself better.
For us, a mold relocation is more than just a change of production partner. We take over existing injection molds in a structured way and simultaneously use the relocation to optimize the series technically and economically. We consider the mold, process, automation, and production site in combination.
Tool
Check mold condition and serial suitability, plan the takeover.
Process
Optimize machine parameters, cycle times, and material usage.
Automation
Automate part removal, handling, and downstream processes.
Location
Reduce series costs through optimal site selection.
One Project Manager. One Team. Our Responsibility.
A project manager takes over the overall management of your relocation and is your dedicated point of contact. We take responsibility for the entire transfer - from mold relocation to a start of final series production - while ensuring a continuous supply.
Two sites. One profitable solution.
With our production sites in Germany and Poland, we offer the flexibility to manufacture existing series where technical requirements, quality, and cost-effectiveness align best.

Heiligenhaus, Germany
Project management, engineering, toolmaking, industrialization, and automated series production.

Nielbark, Poland
Competitive injection molding and labor-intensive assembly for high volumes.
Reference Project
When security of supply can't wait.
Initial Situation
Following the insolvency of its previous supplier, a leading German manufacturer in battery technology had to secure its existing series production on short notice.
Solution
Lüttgens took over 15 existing injection molds, relocated production to the Polish site in Nielbark, and organized the short-term restart of series production there.
Result
48 hrs.
until start of production after mold delivery
15 molds
taken over and put into production
12 %
lower part costs
How profitable can your plastic component be?
Do you want to relocate an existing series production or improve its cost-effectiveness? Talk to us about your initial situation. Together, we will examine the possibilities for your series.